Abstract:
Combined with a practical example of construction, the causes of deviation on bored pile foundation are analyzed and its treatment method is given. First,the deviation of bored pile is measured. Then the measures using anchor jacked pile to strengthen the foundation for remedy this kind of accidents also are presented from the aspects of construction and design. The ultimate bearing capacity of the treated pile accounts for more 200% of the design capacity. The measured settlement of buildings is small and uniform, indicating that the treatment method achieves the desired result and it can be used for reference.
CHEN Wan-Qing,DIAO Zhi-Quan,LIN Qing-Liang. Pile foundation inclination and deflection treatment of a practice and training building[J]. Architecture Technology, 2011, 42(06): 566-567.