建筑技术
 
 
建筑技术
市政工程施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索
顶管穿越下凹式立交桥区道路及挡墙变形控制技术
赵萌
北京建工土木工程有限公司,100015,北京
Road and Retaining Wall Deformation Control Technique for Pipe 
Jacking Passing Through Concave-Down Overpass Area
Zhao Meng
BCEG Civil Engineering Co.,Ltd., 100015, Beijing, China
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 北京土城北桥区积水治理工程D1400 mm进出水管线施工中,采取顶前预加固,控制顶进速度、出土量、泥水仓压力等技术措施,并根据监测信息及时调整顶管施工,形成动态管理,将变形量控制在允许范围内。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
赵萌
关键词顶管施工   道路挡墙   变形控制     
Abstract: During D1400mm water supply and drainage pipeline construction of Beijing Tucheng Beiqiao District water accumulation treatment project, various technical measures were adopted, such as pre-strengthening before jacking, jacking speed control, earth excavation quantity, slurry chamber pressure, etc. Pipe jacking construction was adjusted timely according to practical monitoring information, to realize dynamic management and to control the deformation within the allowable range.
Key wordspipe jacking construction   road retaining wall   deformation control   
引用本文:   
赵萌. 顶管穿越下凹式立交桥区道路及挡墙变形控制技术[J]. 建筑技术, 2018, 49(11): 1205-.
Zhao Meng. Road and Retaining Wall Deformation Control Technique for Pipe 
Jacking Passing Through Concave-Down Overpass Area[J]. Architecture Technology, 2018, 49(11): 1205-.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2018/V49/I11/1205
 
没有找到本文相关图表信息
没有本文参考文献
[1] 刘肖. 砂卵石层浅埋暗挖临近桥桩注浆加固技术[J]. 建筑技术, 2017, 48(6): 620-.
[2] 于艺林,张帅,杨晓毅,孔德兴,何勇. 动态监测技术在城市中心紧邻地铁深基坑工程施工中的应用[J]. 建筑技术, 2015, 46(12): 1069-.
[3] 罗魏凌. 悬挂式柔性动态幕墙钢支撑施工技术[J]. 建筑技术, 2013, 44(4): 337-.
[4] 张洪涛, 郑重. 穿越京杭运河输水管道顶管施工质量控制[J]. 建筑技术, 2012, 43(9): 791-793.
[5] 杜小红, 马 健, 张军良. 北京财富中心二期写字楼全焊接钢板墙施工工艺[J]. 建筑技术, 2012, 43(10): 877-880.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn